
Key Points
- 01Redwire (RDW) secures a new $20 million DARPA contract under the Otter program
- 02Funding supports additional testing of a scaled SabreSat in very low-Earth orbit
- 03Total Otter awards to Redwire (RDW) now stand at $64 million across two phases
- 04A subscale precursor mission is targeting a late 2027 VLEO flight to test air-breathing propulsion
Redwire lands new $20 million DARPA Otter award
Redwire Corporation has been awarded a $20 million contract from the Defense Advanced Research Projects Agency to conduct additional testing and experimentation on a scaled version of its SabreSat spacecraft in very low-Earth orbit. The work falls under DARPA’s Otter program, which is focused on developing air-breathing electric propulsion technology for spacecraft operating in the lowest reaches of orbit.
The new contract funds a precursor flight test using a subscale SabreSat platform in very low-Earth orbit. This additional testing is intended to reduce risk for the broader research and development effort associated with the Otter program.
Phased flight approach and funding structure
Redwire’s latest $20 million award builds on a previously announced $44 million Phase 2 contract under the same DARPA Otter program. The earlier award covers full-scale spacecraft manufacturing and launch delivery for the main Otter mission.
Combined, the two Otter contracts total $64 million and support a phased flight approach for advancing air-breathing spacecraft technology. The new contract is specifically directed at tests of a scaled SabreSat, while the Phase 2 funding is tied to the full-scale spacecraft that will follow.
Very low-Earth orbit precursor mission
As part of the new award, Redwire will prepare a precursor mission using a subscale version of its SabreSat spacecraft. This mission is targeting a launch in late 2027 and will operate in very low-Earth orbit, an orbital regime where satellites face increased atmospheric drag.
The subscale flight is expected to last less than a day in orbit and will be used to test the air-breathing electric propulsion system on orbit for the first time. Data gathered from this mission is intended to inform and de-risk the subsequent full-scale Otter demonstration.
Role of SabreSat and program objectives
SabreSat serves as the spacecraft platform for Redwire’s contributions to the Otter program, both in scaled and full-size configurations. The scaled version funded by the new $20 million contract will be used to validate key propulsion technologies and operational concepts in the challenging conditions of very low-Earth orbit.
By structuring the Otter effort around a precursor mission followed by a full-scale demonstration, the program aims to incrementally mature air-breathing electric propulsion capabilities. Redwire’s combined $64 million in awards reflects its central role in executing this phased test and demonstration campaign.
Key Takeaways
- 01Redwire (RDW)’s latest $20 million DARPA award strengthens its position as a key contractor in the Otter very low-Earth orbit program.
- 02The two Otter contracts, totaling $64 million, are structured to advance air-breathing propulsion through a stepwise sequence of subscale and full-scale missions.
- 03The planned late-2027 subscale SabreSat flight is a critical risk-reduction step, enabling on-orbit validation of air-breathing electric propulsion in very low-Earth orbit.
References
- https://finance.yahoo.com/technology/articles/redwire-awarded-20-million-contract-120000158.html?.tsrc=rss
- https://payloadspace.com/redwire-wins-20m-darpa-contract-for-second-vleo-demo/
- https://www.stocktitan.net/news/RDW/redwire-awarded-20-million-contract-for-additional-otter-vleo-tnflzbbjisfr.html
- https://rallies.ai/news/redwire-wins-20-million-darpa-contract-for-additional-spacecraft-testing-22af06d7f373cc1b