
Key Points
- 01First Solar (FSLR) has inaugurated the first phase of its Gaffney, South Carolina facility
- 02The new plant represents about $330 million in investment
- 03The facility adds 3.7 GW of Series 6 Plus module finishing capacity
- 04Total U.S. manufacturing capacity rises to 17.7 GW per year
First phase of Gaffney, South Carolina facility inaugurated
First Solar (FSLR) has inaugurated the first phase of its new manufacturing facility in Gaffney, Cherokee County, South Carolina, on October 28, 2026. The approximately $330 million facility marks a major expansion of the company’s U.S. manufacturing footprint and focuses on the final production processes for its Series 6 Plus photovoltaic modules. The inauguration event was scheduled for 13:00 US Eastern Time and was to be livestreamed, with company executives, employees and community representatives in attendance.
The Gaffney facility onshores finishing steps for the Series 6 Plus modules, which feature aluminum under-mount frames and dual junction boxes. By situating these final manufacturing stages in South Carolina, First Solar is increasing its domestic production capabilities for its thin-film solar technology while extending its presence into the Southeast.
Capacity addition and role in U.S. manufacturing network
The first phase of the Gaffney plant adds 3.7 GW of annual finishing capacity for Series 6 Plus modules. With this addition, First Solar’s total U.S. manufacturing capacity reaches 17.7 GW per year. The South Carolina plant joins three fully vertically integrated manufacturing sites in Ohio and additional facilities in Alabama and Louisiana, as well as research and development centers in Ohio and California.
The Gaffney site is dedicated to module finishing rather than full vertical integration, complementing the company’s existing production lines. This configuration allows First Solar to expand total output of its thin-film photovoltaic modules while leveraging its established upstream manufacturing operations elsewhere in the United States.
Employment impact and future expansion plans
The South Carolina facility currently employs approximately 500 people. First Solar expects employment at the site to approach 700 once the second phase of the project is completed, which is planned for mid-2027. The phased approach allows the company to ramp up production capacity and workforce incrementally as the plant’s operations expand.
The inauguration of the first phase signals the start of commercial activity at the Gaffney facility while setting the stage for further growth. As additional capacity comes online with the second phase, the site is expected to play a larger role in First Solar’s U.S. manufacturing base for Series 6 Plus modules.
Product focus and technical characteristics
The Gaffney plant is dedicated to finishing First Solar’s Series 6 Plus photovoltaic modules. These modules are based on thin-film cadmium-telluride technology and in this configuration feature aluminum under-mount frames and dual junction boxes. The onshored finishing processes at the South Carolina facility are aimed at preparing the modules for residential, commercial, industrial, and utility-scale solar applications.
By concentrating on the final production steps for Series 6 Plus modules, the facility integrates into a broader product portfolio that includes monocrystalline, polycrystalline, and thin-film photovoltaic modules, as well as solutions for building-integrated and floating solar applications. The new plant reinforces First Solar’s capability to supply a wide range of solar module products from U.S.-based manufacturing sites.
Key Takeaways
- 01First Solar (FSLR)’s Gaffney facility is a significant new U.S. hub for finishing Series 6 Plus thin-film modules, adding dedicated capacity without duplicating upstream production.
- 02The 3.7 GW capacity increase to 17.7 GW underscores the company’s strategy of expanding domestic manufacturing scale rather than relying solely on overseas production.
- 03Employment growth from about 500 to an expected 700 workers after the second phase suggests the project will have a growing economic footprint in South Carolina through mid-2027.
References
- https://finance.yahoo.com/energy/articles/first-solar-inaugurates-first-phase-214600992.html?.tsrc=rss
- https://www.solarpowerworldonline.com/2026/10/first-solar-to-inaugurate-south-carolina-solar-panel-finishing-facility/
- https://www.indexbox.io/blog/first-solar-opens-330-million-south-carolina-module-finishing-plant/
- https://news.metal.com/newscontent/104182979-smm-news-flash-first-solar-schedules-south-carolina-facilitys-first-phase-inauguration-for-october-28